8 800 775-99-97 Request a call
RU
Equipment catalog
Fuel tanker 38 m3
Fuel tanker 45 m3

Fuel tanker 40 m3

914210
Fuel tanker 40 m3
  • Volume
    40 m3
  • Number of axes
    3 axes
  • Curb weight
    from 8,400 kg

Technical data

  • Volume

    40 m3
  • Type of equipment

    tank semi-trailer (fuel tanker)
  • Bulb shape

    cylinder of variable cross-section
    (bottle shape)
  • Curb weight

    from 8,400 kg
  • Overall dimensions

    length: 11,465 mm

    width: 2,550 mm

    height: 3,750 mm
  • Number of sections

    Section 1: 10.9 m3

    Section 2: 12.4 m3

    Section 3: 6.2 m3

    Section 4: 10.5 m3

    The volumes of the sections are listed in order from the fifth-wheel coupling.
  • Fifth-wheel coupling height

    1,150 mm
  • Number of axes

    3 axes
  • Suspension and tires

    • 3 axes;
    • drum/disc type brake mechanisms;
    • tires (at the discretion of the manufacturer) with a dimension of 385/65 R22.5 with a disc - 6 + 1 pcs.
  • Painting

    THE SEMI-TRAILER IS PAINTED ACCORDING TO THE PROPRIETARY THREE-STAGE PAINTING SYSTEM "PRIME SYSTEM":
    • surface treatment in a shot blasting chamber;
    • coating with a primer containing anticorrosive elements;
    • painting with premium enamel.
  • Brake system

    pneumatic two-circuit.
  • Electrical equipment

    electrical equipment Aspoeck / Hella / Ermax or similar.
View all
Chassis
Other
Optional equipment
Chassis
  • pin with a diameter of 2”, international type with a base plate;
  • the landing gear is two-speed with manual one-way drive;
  • ecological box with drain on two sides;
  • Normec hatches (Italy) according to the number of sections or similar;
  • pneumatic bottom valves Dixon (England) / Normec (Italy) according to the number of sections or equivalent;
  • bottom valve control unit;
  • ball valves according to the number of sections;
  • the drain cabinet is located in the direction of movement on the right side (passenger side);
  • spare wheel mounting device;
  • anti-roll bar with height adjustment;
  • galvanized steel footpath;
  • ladder at the back of the tank;
  • aluminum lifting railing (height 800 mm);
  • galvanized brackets for attachments.
Other
composite drain hose 4 m Spain / Italy / England or equivalent
1 pcs pc.
quick-release connections of the Camlock type or an analog on drain sleeves
1 set set
pencil cases for drain hoses made of PVC
2 pcs pcs
sand box
1 pcs pc.
fire extinguisher box
2 pcs pcs
water tank with faucet and dispenser for liquid soap
1 pcs pc.
contour reflective marking with premium quality tape
1 set set
a plate indicating the type of cargo
1 pcs pc.
anti-rollback stops
individual wings with brackets
6 pcs pcs
rear wheel mudguards
2 pcs pcs
side protection
2 pcs pcs
Optional equipment
They are selected based on your wishes and the specifics of your business
Adding 1 compartment to the standard configuration
Installation of equipment for bottom filling
Preparation of the semi-trailer for the installation of the bottom filling
PVA recirculation hose with PU DN80 4 m couplings
General (collector) drain
Drain on two sides, with the installation of an additional cabinet (without a spare wheel bracket)
Installation of an insulated through cabinet – drain on the right (including the bracket for the spare wheel)
Installation of lighting in the drain cabinet
Installation of lighting of the working area on both sides (when installing drain cabinets on both sides)
Installation of the SSHN-50 pump with hydraulic drive (600 l/min) with an additional filter element FGO DN 80
(1000 microns)
Preparation for the installation of the SSHN-50 pump
Installation of the SSHN-50 pump with an additional filter element FGO DN 80 (1000 microns) and the PPO-40 counter (fuel delivery unit)
Additional paint color
Installation of an additional bracket for a spare wheel with a winch (without a spare wheel)
Additional spare wheel with disc (brand according 385/65 R22,5 to the wheels mounted on the semi-trailer)
Additional drain sleeve composite 4 m
Installation of an additional 4 m or 6 m pencil case for a PVC drain sleeve
Installation of a metal tool box
Ladder decking between the necks of the semi-trailer
Installation of pockets for danger signs (9 diamonds)
Installation of a metrostock on a semi-trailer for the transportation of fuel and lubricants
Installation of calibration bars
Non-standard semi-trailer paint color

Other

composite drain hose 4 m Spain / Italy / England or equivalent
1 pcs pcs
quick-release connections of the Camlock type or an analog on drain sleeves
1 set set
pencil cases for drain hoses made of PVC
2 pcs pcs
sand box
1 pcs pcs
fire extinguisher box
2 pcs pcs
water tank with faucet and dispenser for liquid soap
1 pcs pcs
contour reflective marking with premium quality tape
1 set set
a plate indicating the type of cargo
1 pcs pcs
anti-rollback stops
individual wings with brackets
6 pcs pcs
rear wheel mudguards
2 pcs pcs
side protection
2 pcs pcs

Chassis

  • pin with a diameter of 2”, international type with a base plate;
  • the landing gear is two-speed with manual one-way drive;
  • ecological box with drain on two sides;
  • Normec hatches (Italy) according to the number of sections or similar;
  • pneumatic bottom valves Dixon (England) / Normec (Italy) according to the number of sections or equivalent;
  • bottom valve control unit;
  • ball valves according to the number of sections;
  • the drain cabinet is located in the direction of movement on the right side (passenger side);
  • spare wheel mounting device;
  • anti-roll bar with height adjustment;
  • galvanized steel footpath;
  • ladder at the back of the tank;
  • aluminum lifting railing (height 800 mm);
  • galvanized brackets for attachments.

Optional equipment

They are selected based on your wishes and the specifics of your business
Adding 1 compartment to the standard configuration
Installation of equipment for bottom filling
Preparation of the semi-trailer for the installation of the bottom filling
PVA recirculation hose with PU DN80 4 m couplings
General (collector) drain
Drain on two sides, with the installation of an additional cabinet (without a spare wheel bracket)
Installation of an insulated through cabinet – drain on the right (including the bracket for the spare wheel)
Installation of lighting in the drain cabinet
Installation of lighting of the working area on both sides (when installing drain cabinets on both sides)
Installation of the SSHN-50 pump with hydraulic drive (600 l/min) with an additional filter element FGO DN 80
(1000 microns)
Preparation for the installation of the SSHN-50 pump
Installation of the SSHN-50 pump with an additional filter element FGO DN 80 (1000 microns) and the PPO-40 counter (fuel delivery unit)
Additional paint color
Installation of an additional bracket for a spare wheel with a winch (without a spare wheel)
Additional spare wheel with disc (brand according 385/65 R22,5 to the wheels mounted on the semi-trailer)
Additional drain sleeve composite 4 m
Installation of an additional 4 m or 6 m pencil case for a PVC drain sleeve
Installation of a metal tool box
Ladder decking between the necks of the semi-trailer
Installation of pockets for danger signs (9 diamonds)
Installation of a metrostock on a semi-trailer for the transportation of fuel and lubricants
Installation of calibration bars
Non-standard semi-trailer paint color